Performance catamaran progress September 2024
We have installed bridge deck floor and supports, forward bridgedeck beam, aft bridgedeck beam, cockpit floor and seats. All of these parts required lofting and manual cutting with the forward and aft beams also being formed in our press brake. All bridge deck beams are now fully welded to floors.